Rail Business Rules | McConnell Dowell | VOC

 VOC
CertificationCertification RequirementsUpload RequirementsExamples

Operator.VOC.MCD - VOC - Backhoe

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Concrete Placing Boom PB

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Dogger DG

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Dozer

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Dump Truck (Articulated)

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Dump Truck (Rigid)

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Elevating Work Platform

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Excavator

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Forklift

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Front End Loader

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Grader

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Non Slewing Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Personnel Hoist HP

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Piling Rig

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Portal Boom Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Rigger

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Roller

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Scaffolder

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Scissor Lift

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
    Note: 'Gennie Booms and Scissors' also acceptable wording
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Scraper

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Skid Steer

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Telescopic Material Handler

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • Note: 'Telehandler' is acceptable wording
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC - Water Cart

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Bridge and Gantry Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Class ‘A’ High Pressure Water Jetting Systems

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Drill Rig- Air

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Drill Rig- Class 1

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Drill Rig- Class 2

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Drill Rig- Core

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Drill Rig- Directional

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Drill Rig- Directional Drilling

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Chainsaw

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Circular Saw

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Compressed Air Tools

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Explosive Power Tools

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Jumping Jack

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Plate Compactor

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Quick Cut (Demolition Saw)

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Instrument Scabbler

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Lighting towers

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – NDD (Vac Truck)

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite


Operator.VOC.MCD - VOC – Piling hammers

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Self Erecting Tower Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Slewing Mobile Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Tower Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite

Operator.VOC.MCD - VOC – Vehicle Loading Crane

  • Applicants name to be displayed on the document along with qualifications
  • Must show operator's qualifications
  • The competency must be indicated on the Verification of Competency (VOC) as it is shown in this role title of the selected role on the data application
  • must include a list of assessed activities inclusive of pre-operation, operation and shut down stages of plant usage and knowledge of safety features
  • Must be signed off by the verifier of the VOC

Template provided in portal however does not have to be on this template.

  • Date of assessment to be recorded as Issue date within Onsite
  • 1 year expiration date form date of assessment to be calculated as expiry date and recorded within Onsite