SMS 4801.Safety Management.AS/NZS4801 OR ISO48001 Certificate OR
ISO45001:2018
Business Name on Certification to match the organisation registered. If it doesn't match, government certified evidence must be provided to link the ABN or business names together. This is ideally a letter or download from ABR showing the linkage.
Must be certificated AS/NZS 4801 or OHSAS 18001 or ISO 45001:2018
JAS-ANZ stamp to be present on 4801 - If a certificate is supplied that is a combined 4801 and 18001 there will be NO JAS-ANZ stamp present. This is acceptable.
From March 12, 2018: ISO 45001 will start to be issued in lieu of OHSAS 18001
From September 30, 2021: OHSAS 18001 will no longer be accepted - ISO 45001 MUST be supplied
Issue and expiry as per certification
Black and white or colour is acceptable
Issue and expiry as per certification
Resource.Contractors.Sedgman Sub-contractor Authority Form
>
All fields must be completed
The sub-contractor company name must match the registering company in the system.
The Authorised Company Representative from the Principal Contractor, must complete the form and sign and date
The Authorised Company Representative from the sub-contractor company, must sign and date
The following Sedgman personnel are able to approve:
Christopher Forbes
Bradley Mcintyre
Patrick Jacobsen
Issue date – Date signed by principle company
Expiry date – 5 years from issue date
Subcontractor Information Form
All fields must be completed.
The primary contractor company name must match a registered company in the system.
The sub-contractor company name must match the registering company in the system.
The Authorised Company Representative from the Principal Contractor must print name and sign.
The Authorised Company Representative from the sub-contractor company must print name and sign.
The Principle Contractor Representative must circle the relevant company, print name and sign.
A Secondary Principle Contractor is not mandatory
Principle Contractor signatures do not need to be verified
Issue date – date of verification
No expiry date
Sub-Contractor Details
At least one line must be completed.
The respondent must print their name, sign and date the form.
Pegasus staff must click here and note this additional information prior to verification of this competency