Construction Business Rules | Lendlease | Assets | Building | Plant Inspection

DocumentDocument RequirementsUpload RequirementsExamples
Lendlease Plant Inspection Checklist
  • Plant details to be displayed on evidence (Type, Make and Model)
  • Correct Plant Inspection Checklist form must used.                                                                      
  • The Part A Documentation Checklist section of the form must be completed.
  • All mandatory (Y/N) requirements boxes must be completed in Part A Documentation Checklist.
  • Contractor/Supplier Signature boxes must be completed, signed and dated.       

Issue Date = As per report

Expiry Date = 12 months


Lendlease Plant Inspection Checklist - RAAF Tindal 
  • Plant details to be displayed on evidence (Type, Make and Model)
  • Correct Plant Inspection Checklist form must be used (eg. Tip Truck Plant Inspection for a Tip Truck)
  • All asset information (excluding the Plant Induction / Sticker No) must be completed
  • The date on the form must be no older than one week of submitting the asset for approval
  • All other sections of the form are not required to be filled out until deployment at site                                                                     
  • The Part A Documentation Checklist section of the form must be completed.
  • All mandatory (Y/N) requirements boxes must be completed in Part A Documentation Checklist.
  • Contractor/Supplier Signature boxes must be completed, signed and dated.       
  • Primary Contractors will now need to review all plant documentation from their subcontractors prior to them loading the documentation onto Pegasus.  Plant will not be approved without an initial review from the Primary Contractor 
    • Primary Contractors 
      • BMD
      • Barpa
      • Nilsen’s
      • Sunbuild
      • Jaytex
      • Downer 
      • Duratec
      • Adb Safegate
      • CCP&D
      • Ausco
  • Primary contractors are to evidence this by signing the bottom of the Plant Inspection Checklist in the blank space with name, role, signature and date.                                                                                                             
  • Year of manufacture required to be listed for the below types plant
    • Concrete Placing Boom

    • Concrete Satellite Boom

    • Crane Mini Crawler

    • Crane Mobile Rough Terrain

    • Crane Non-Slewing (Franna)

    • Crane Self Erecting

    • Crane Slew Hydraulic Boom Truck Mounted

    • Crane Slew Track Mount

    • Crane Tower Horizontal

    • Crane Tower Luffing

    • Duct Lifter

    • Generator

    • Generic Plant

    • One Person Vertical Lift

    • Piling Rig 

  • Operating hours required to be listed for below types of plant 

    • Asphalt Cold Planer
    • Asphalt Paver
    • Backhoe
    • Boom lift
    • Boring Rig
    • Concrete Finisher
    • Concrete Placing Boom
    • Concrete Satellite Boom
    • Concrete Saw
    • Concrete Static Pump
    • Crane Mini Crawler
    • Crane Mobile Rough Terrain
    • Crane Non-Slewing (Franna)
    • Crane Self Erecting
    • Crane Slew Track Mount
    • Crane Slew Hydraulic Boom Truck Mounted
    • Crane Tower Horizontal
    • Crane Tower Luffing
    • Crane Vehicle Loading
    • Dozer
    • Drilling Rig
    • Drott
    • Duct Lifter
    • Excavator (Tracked)
    • Excavator (Wheels)
    • Forklift
    • Forklift Truck Mounted
    • Generator
    • Grader
    • Hydrovac
    • Lighting Tower
    • Loader Front End
    • Loader Mini
    • Loader Skid Steer
    • Loader Tracked Skid Steer
    • One Person Vertical Lift
    • Piling Rig
    • Roller Asphalt
    • Roller Multi Tyre
    • Roller Single Drum
    • Scissor Lift
    • Scraper
    • Soil Compactor
    • Telehandler < 3 tonne
    • Telehandler > 3 tonne
    • Tip Truck
    • Vacuum Lifter
    • Vibrating Plates & Rammers
    • Water Truck

Issue Date = As per report

Expiry Date = 12 months