CompetencyCompetency RequirementsUpload requirementsExamples
Safety.Induction.Open Cut and Generic ATUI Form

Click HERE to access a copy of the form

Click HERE to access the authorised approvers list

All 6 pages of the form must be uploaded

Page 1 

    • Name of inductee must match registering person
    • Position must be completed
    • Contractor Company must be completed
    • WHC Contract Owner or Coordinator email – NOT MANDATORY
    • Must select Primary WHC site  and all sections must be completed.
    • Induction(s) required – must be completed
    • Approval section:
      The contract owner or coordinator needs to be listed, they must sign and date - must be on the approved list. Pegasus to escalate to site if the name is not on the list. 
      The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.
    • The Manager of Mining engineering (MME) needs to sign for the role 'All Open Cut - Operator'.

NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen.

Page 2 

    • Inductions; Check list must be completed (Completion not required for re-inductees)

Page 3 

    • Roles; A role in the Open Cut section must be selected

Page 4, 5 & 6 

    • Complete if applicable  

 

Only version 12 & 13 will be accepted.

Form must be no older than 3 months - refer to date signed by contract owner or coordinator

 

 

 


Safety.Induction.Underground and Generic ATUI Form  

Click HERE to access a copy of the form

Click HERE to access the authorised approvers list

All 6 pages of the form must be uploaded

Page 1

    • Name of inductee must match registering person
    • Position must be completed
    • Contractor Company must be completed
    • WHC Contract Owner or Coordinator email – NOT MANDATORY
    • Must select Primary WHC site  and all sections must be completed.
    • Induction(s) required – must be completed
    • Approval section:
      The contract owner or coordinator needs to be listed, they must sign and date - must be on the approved list. Pegasus to escalate to site if the name is not on the list. 
      The mechanical or electrical is only required if the role is linked to any mechanical or electrical role.
      The Manager of Mining engineering (MME) needs to sign for ALL underground trades and Operator for Narrabri. 

NOTE: MME sign off not needed for surface role at Narrabri

Page 2 

    • Inductions; Check list must be completed (Completion not required for re-inductees)

Page 3

    • Roles; A role in the Underground section must be selected

Page 4, 5 & 6

    • Complete if applicable  

 

Only version 12 & 13 will be accepted.

Form must be no older than 3 months - refer to date signed by contract owner or coordinator

 

  

Page Version: 32

Note: This Document is not version controlled when printed.

  • No labels