Skip to end of metadata
Go to start of metadata
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 6
Next »
Construction
COMPETENCY | COMPETENCY REQUIREMENTS | UPLOAD REQUIREMENTS | EXAMPLES |
---|
Engineering & Design.Assessment.John Holland - Construction Manager Path 1 | - This competency is reviewed by a John Holland assessor.
- A signed copy of the assessment document is required for this role.
- There is a 4 year expiry on this competency.
| - Please upload a copy of your signed assessment document.
- Choose an assessor from the list to assess your application.
- Issue date = As shown on assessment
- Expiry date = 4 years from Assessment Date
| |
Engineering & Design.Assessment.John Holland - Construction Manager Path 2 | - This competency is reviewed by a John Holland assessor.
- A signed copy of the assessment document is required for this role.
- There is a 4 year expiry on this competency.
| - Please upload a copy of your signed assessment document.
- Choose an assessor from the list to assess your application.
- Issue date = As shown on assessment
- Expiry date = 4 years from Assessment Date
| |
Engineering & Design.Assessment John Holland – Graduate Construction Manager
| - Assessment Criteria Tool
- Must show the name of the Role being applied
| - Must be signed and Dated
- Valid 4 years from signed date of Assessor
| |
Engineering,Statement of Competency. SOC – John Holland – Graduate Construction Manager | - Statement of Competency which has the reference to the Role being applied
| - Must be signed and Dated
- Valid 4 years
- Issued date is mandatory
| |