- Primary Contractors will now need to review all plant documentation from their subcontractors prior to them loading the documentation onto Pegasus. Plant will not be approved without an initial review from the Primary Contractor
- Primary Contractors
- BMD
- Barpa
- Nilsen’s
- Sunbuild
- Jaytex
- Downer
- Duratec
- Adb Safegate
- CCP&D
- Ausco
- Primary contractors are to evidence this by signing the bottom of the Plant Inspection Checklist in the blank space with name, role, signature and date.
- Year of manufacture required to be listed for the below types plant
Concrete Placing Boom Concrete Satellite Boom Crane Mini Crawler Crane Mobile Rough Terrain Crane Non-Slewing (Franna) Crane Self Erecting Crane Slew Hydraulic Boom Truck Mounted Crane Slew Track Mount Crane Tower Horizontal Crane Tower Luffing Duct Lifter Generator Generic Plant One Person Vertical Lift Piling Rig
- Asphalt Cold Planer
- Asphalt Paver
- Backhoe
- Boom lift
- Boring Rig
- Concrete Finisher
- Concrete Placing Boom
- Concrete Satellite Boom
- Concrete Saw
- Concrete Static Pump
- Crane Mini Crawler
- Crane Mobile Rough Terrain
- Crane Non-Slewing (Franna)
- Crane Self Erecting
- Crane Slew Track Mount
- Crane Slew Hydraulic Boom Truck Mounted
- Crane Tower Horizontal
- Crane Tower Luffing
- Crane Vehicle Loading
- Dozer
- Drilling Rig
- Drott
- Duct Lifter
- Excavator (Tracked)
- Excavator (Wheels)
- Forklift
- Forklift Truck Mounted
- Generator
- Grader
- Hydrovac
- Lighting Tower
- Loader Front End
- Loader Mini
- Loader Skid Steer
- Loader Tracked Skid Steer
- One Person Vertical Lift
- Piling Rig
- Roller Asphalt
- Roller Multi Tyre
- Roller Single Drum
- Scissor Lift
- Scraper
- Soil Compactor
- Telehandler < 3 tonne
- Telehandler > 3 tonne
- Tip Truck
- Vacuum Lifter
- Vibrating Plates & Rammers
- Water Truck
| Issue Date = As per report Expiry Date = 12 months | Image Added |