Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Reverted from v. 13

Image RemovedImage Added


CompetencyCompetency RequirementsUpload RequirementsExamples
Mechanical.Appointed.Mr Arthur South Mechanical Appointment Form
  • Must be the Mt Arthur South 'Mechanical' Appointment Form
  • Must be form version 56.0
  • Name on appointment form to match the person registered
  • "Contractor Signature accepting appointments below section - " must be signed by the worker
  • Appointment form does NOT require Thiess signature prior to upload.

  • All sections of the form must be complete (section 5 can be incomplete)
  • Section 2 for Qualified Mechanical Tradesperson must be filledor Section 3 if they are Non-statutory Mechanical Worker. Both sections if they have multiple roles/appointments.

Click HERE to download the appointment form


  • No issue or expiry date 
Image Removed


Electrical.Appointed.Mt Arthur South Electrical Appointment Form
  • Must be the Mt Arthur South 'Electrical' Appointment Form
  • Name on appointment form to match the person registered
  • Must be form version 1.0
  • "Contractor Signature accepting appointments below section - " must be signed by the workerAppointment form does NOT require Thiess signature prior to upload.
  • All sections of the form must be complete .(however "THIESS Electrical Engineer" section can be left blank)

Click HERE to download the appointment form


  • No issue or expiry date
Image Removed