CompetencyCompetency RequirementsUpload RequirementsExamples

Generic.VOC.Verification of Competence for Role Declaration

Click here for downloadable TransGrid VOC template

RTO Issued VOC

The applicants name shown on this document needs to match the applicants registered name in Onsite

The matching competency name needs to be displayed on document

Assessment must have been conducted by a Registered Training Organisation (RTO)

The issuing RTO must hold the correct authority to deliver that unit of competence

NOTE: The competency must be indicated on the Verification of Competency (VOC) as it is shown in this competency title – If there is a mismatch with regard to the competency naming used on the VOC compared to what is displayed as the competency title in Onsite, Pegasus will seek  site approval for the document.

 

 

 

2. Transgrid Issued VOC:

 

The applicants name shown on this document needs to match the applicants registered name in Onsite

The matching competency name needs to be displayed on document

 

 

3.Third Party Issued VOC - Subcontractor/Contractor/Other Training Provider (Not an RTO):

Only Third Parties on TransGrid’s approved list will be accepted:

Approved Third Party VOC

TCO Industries Pty Ltd

Consolidated Power Projects

 

For those Third Parties who wish to have their VOC process added to TransGrid’s approved list please email leonie.mccallum@transgrid.com.au to arrange.












































Issue Date = VOC completion date

Expiry Date = Date which is calculated to be 5 years from VOC completion date

Pegasus Staff Only: CLICK HERE for additional business rule information that must be adhered to prior to file verification


Expiry date is to be recorded on all plant VOC 5 years from the date of issue. Please note even if an expiry date is listed this is still to be recorded as 5 years from date of issue.











































































Operator.VOC.Mobile Plant VOC Declaration

Click here for downloadable TransGrid VOC template

Operator Plant.VOC.ATV - 8 x 8 Avenger






































Operator Plant.VOC.ATV - Easements
Operator Plant.VOC.ATV - Substations
Operator Plant.VOC.ATV -Tracked Snow Mobile
Operator Plant.VOC.Backhoe
Operator Plant.VOC.Crane - Bridge / Gantry < 3 movements
Operator Plant.VOC.Crane - Bridge / Gantry > 3 movements
Operator Plant.VOC.Crane - Concrete Placing Boom
Operator Plant.VOC.Crane - Derrick
Operator Plant.VOC.Crane - Non Slewing Mobile Crane >3t
Operator Plant.VOC.Crane - Portal Boom Crane
Operator Plant.VOC.Crane - Self Erecting Crane
Operator Plant.VOC.Crane - Slewing <100t
Operator Plant.VOC.Crane - Slewing <20t
Operator Plant.VOC.Crane - Slewing <60t
Operator Plant.VOC.Crane - Slewing >100t
Operator Plant.VOC.Crane - Tower Crane
Operator Plant.VOC.Crane Operator - Vehicle Loading Crane < 10T
Operator Plant.VOC.Crane Operator - Vehicle Loading Crane > 10T
Operator Plant.VOC.Dozer
Operator Plant.VOC.EWP - Boom Type>11m
Operator Plant.VOC.EWP - Narrow Track >11m
Operator Plant.VOC.EWP - Personnel and Material Hoist
Operator Plant.VOC.EWP - Truck mounted >11m
Operator Plant.VOC.EWPA Yellow Card
Operator Plant.VOC.Excavator
Operator Plant.VOC.Excavator Non-Destructive Vacuum
Operator Plant.VOC.Forklift Operator
Operator Plant.VOC.Front End Loader (Track)
Operator Plant.VOC.Front End Loader (Wheel)
Operator Plant.VOC.Grader
Operator Plant.VOC.Integrated Tool Carrier
Operator Plant.VOC.Operator - Stringing Winch
Operator Plant.VOC.Operator - Winch
Operator Plant.VOC.Scraper
Operator Plant.VOC.Skid steer
Operator Plant.VOC.Telehandler < 3T (Plus various attachments)
Operator Plant.VOC.Telehandler > 3T (Plus various attachments)
Operator Plant.VOC.Tractor