Page tree
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

CompetencyCompetency RequirementsUpload RequirementsExamples
Electrical.Statement of Attainment.Supervised electrical workers licence

When statement of Attainment is Uploaded:

  • RTO Name, National Provider Code / RTO Number & Logo to be displayed on document
  • Name on certificate to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • completion date or issue date must be displayed
  • Unit of competency listed on certificate to match the nominated unit within Onsite
  • Name and / or signature of issuer
  • Document / Certificate / Statement of Attainment Number
  • Nationally Recognised Training logo
  • No expiry

When Transcript (Accepted in lieu of SOA) is uploaded:

  • RTO Name & Logo to be displayed on document
  • Name on transcript / statement of results / Academic history report to match the name in the system (shortened versions accepted e.g. ‘Chris’ accepted for Christopher)
  • completion date or issue date must be displayed
  • Unit of competency listed on document to match the nominated unit within Onsite
  • If individual unit results are displayed the result needs to indicate completion / pass result.
    Grading categories can be referenced HERE
  • No expiry

When statement of attainment is uploaded:

  • Document verifier to ensure the Issue of this document is an RTO.
  • Record the Issue date within Onsite:

Completion date - if listed on certificate (this completion date is always used when displayed)

Issue date - If only an issue date is listed please enter this as the issue date

 

When Transcript (Accepted in lieu of SOA) is uploaded:

  • Document verifier to ensure the Issue of this document is an RTO.
  • Record the Issue date within Onsite

Completion date - if listed on certificate (this completion date is always used when displayed)

Issue date - If only an issue date is listed please enter this as the issue date

If there is a ‘from’ and a ‘to‘completion date shown indicating the course was complete over a time frame longer than 1 day, use the ‘to’ date as the issue date within

 
CompetencyCompetency RequirementsUpload RequirementsExamples
Electrical.Statement of Attainment.Restricted electrical workers licence

When statement of Attainment is Uploaded:

  • RTO Name, National Provider Code / RTO Number & Logo to be displayed on document
  • Name on certificate to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • completion date or issue date must be displayed
  • Unit of competency listed on certificate to match the nominated unit within Onsite
  • Name and / or signature of issuer
  • Document / Certificate / Statement of Attainment Number
  • Nationally Recognised Training logo
  • No expiry

When Transcript (Accepted in lieu of SOA) is uploaded:

  • RTO Name & Logo to be displayed on document
  • Name on transcript / statement of results / Academic history report to match the name in the system (shortened versions accepted e.g. ‘Chris’ accepted for Christopher)
  • completion date or issue date must be displayed
  • Unit of competency listed on document to match the nominated unit within Onsite
  • If individual unit results are displayed the result needs to indicate completion / pass result.
    Grading categories can be referenced HERE
  • No expiry

When statement of attainment is uploaded:

  • Document verifier to ensure the Issue of this document is an RTO.
  • Record the Issue date within Onsite:

Completion date - if listed on certificate (this completion date is always used when displayed)

Issue date - If only an issue date is listed please enter this as the issue date

 

When Transcript (Accepted in lieu of SOA) is uploaded:

  • Document verifier to ensure the Issue of this document is an RTO.
  • Record the Issue date within Onsite

Completion date - if listed on certificate (this completion date is always used when displayed)

Issue date - If only an issue date is listed please enter this as the issue date

If there is a ‘from’ and a ‘to‘completion date shown indicating the course was complete over a time frame longer than 1 day, use the ‘to’ date as the issue date within

 

Page Version: 6

Note: This Document is not version controlled when printed.

  • No labels