Page tree
#trackbackRdf

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Expand
titleAusgrid

Anchor
ausgridinductions
ausgridinductions

 

Environmental Awareness            ‘Environmental’                                             Environmental Management and Sustainability
                        Network Procedures                ‘Network procedures’                                            Network Procedures                        
Competency Competency Requirements Upload Requirements Examples 

Company.Induction.Ausgrid Safety RulesNetwork Access Procedures

 
  • Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:
             
        • Applicant Name
       


      • Uploaded document must also include page of passport that shows
      ‘Safety Rules’
      • ‘Network Access procedures’ as having been achieved with:
                 
            • Ausgrid stamp being shown on this page
                 
            • Date of Training
                 
            • Trainer / Assessor Name
                 
            • Signature
           

          • Ausgrid Certificate of Completion is accepted. It must show
          :
                  Ausgrid Safety Rules
                  Contractors Name
                 
          • :
            • Network Access Procedures
            • Contractors Name
            • Date of completion
      • Record the Issue date within Onsite:
      • Completion date - if listed on certificate (this completion date is always used when displayed)
      • Issue date - If only an issue date is listed please enter this as the issue date
       

      Company.Induction.Ausgrid Contractors Induction

      • Applicants name to be shown on documentation
      • Applicants name must match (However shortened versions such as 'Chris' for Christopher can be accepted)
      • Document must show completion of the Ausgrid Contractor Induction
      • Document must be issued by Ausgrid

          Issue date = Date of training completion
          Expiry date = 3 years from training completion

       

      Company.Induction.Ausgrid Authorisation

      Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:

      • Applicant Name

      Uploaded document must also include page of passport that shows ‘Ausgrid Authorisation’ as having been achieved with:

      • Ausgrid stamp being shown on this page
      • Date of Training
      • Trainer / Assessor Name
      • Signature

      Ausgrid Certificate of Completion is accepted. It must show:

      • Ausgrid Authorisation
      • Contractors Name
      • Date of completion
      • Record the Issue date within Onsite:
      • Completion date - if listed on certificate (this completion date is always used when displayed)
      • Issue date - If only an issue date is listed please enter this as the issue date
       

      Company.Induction.Ausgrid SC1100 - Working Near Underground Cables

      Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:

      • Applicant Name

      Uploaded document must also include page of passport that shows ‘Working Near underground Cables’ as having been achieved with:

      • Ausgrid stamp being shown on this page
      • Date of Training
      • Trainer / Assessor Name
      • Signature

      Ausgrid Certificate of Completion is accepted. It must show:

      • Working near underground cables
      • Contractors Name
      • Date of completion
      • Record the Issue date within Onsite:
      • Completion date - if listed on certificate (this completion date is always used when displayed)
      • Issue date - If only an issue date is listed please enter this as the issue date
       

      Company.Induction.Ausgrid - Overhead Earthing & Short Circuiting /Application of OH HV Earth

      Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:

      • Applicant Name

      Uploaded document must also include page of passport that shows ‘Overhead Earthing & Short Circuiting /Application of OH HV Earth’ as having been achieved with:

      • Ausgrid stamp being shown on this page
      • Date of Training
      • Trainer / Assessor Name
      • Signature

      Ausgrid Certificate of Completion is accepted. It must show:

      • Overhead Earthing & Short Circuiting /Application of OH HV Earth
      • Contractors Name
      • Date of completion
      • Record the Issue date within Onsite:
       
      • Completion date - if listed on certificate (this completion date is always used when displayed)
       
      • Issue date - If only an issue date is listed please enter this as the issue date
       

       

       

       

       

       

       

      Company.Induction.Ausgrid

      - Substation entry

      Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:

      • Applicant Name

      Uploaded document must also include page of passport that shows

      ‘Substation entryh’ as having been achieved with:

      • Ausgrid stamp being shown on this page
      • Date of Training
      • Trainer / Assessor Name
      • Signature

      Ausgrid Certificate of Completion is accepted. It must show:

      • Substation entry
      • Contractors Name
      • Date of completion
      • Record the Issue date within Onsite:
      • Completion date - if listed on certificate (this completion date is always used when displayed)
      • Issue date - If only an issue date is listed please enter this as the issue date
       

      Company.Induction.Ausgrid

      - Recipient Access

      Permits

      Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:

      Applicant Name

      Uploaded document must also include page of passport that shows

      ‘ Recipient Access

      Permits ’ as having been achieved with:

      • Ausgrid stamp being shown on this page
      • Date of Training
      • Trainer / Assessor Name
      • Signature

      Ausgrid Certificate of Completion is accepted. It must show:

      • Recipient Access
      • Permits
      • Contractors Name
      • Date of completion
      • Record the Issue date within Onsite:
      • Completion date - if listed on certificate (this completion date is always used when displayed)
      • Issue date - If only an issue date is listed please enter this as the issue date
       
      Expand
      titleConstruction Induction Card

      Anchor
      OHSconstructioncard
      OHSconstructioncard

      Expand
      titleGeneric Business Rule
      CompetencyCompetency Requirements (Redirection Link)
      OH&S-WHS.Induction.Work Safely in the Construction Industry  Click here for a list of national business rules relating to these competencies                 
      OH&S-WHS.Induction.Construction ACT
      OH&S-WHS.Induction.Construction NSW
      OH&S-WHS.Induction.Construction NT
      OH&S-WHS.Induction.Construction QLD
      OH&S-WHS.Induction.Construction SA
      OH&S-WHS.Induction.Construction TAS
      OH&S-WHS.Induction.Construction VIC
      OH&S-WHS.Induction.Construction WA
      Expand
      titleONSP Project Specific Business Rule
      Anchor
      ONSPOHSconstructioncard
      ONSPOHSconstructioncard

       

      CompetencyCompetency RequirementsUpload Requirements
      OH&S-WHS.Induction.Work Safely in the Construction Industry
      • Only Construction Induction cards completed through classroom training are to be accepted.
      • No white cards completed by online training providers will be accepted.
      • Name on card to match the applicants registered name in Onsite
      • OHS Construction Induction to be listed
      • Only the front side of this card is required to be uploaded.
      • To be issued by the relevant / matching state authority:To be issued by the relevant / matching state authority:Workcover/ Safework / Worksafe NSW
      • Black and white or colour copies accepted
      • Pegasus Staff MUST review the document against additional business rule information prior to verification which is available HERE
      • Date of Completion to be recorded in Onsite as the Issue Date
      • No expiry is required to be entered.
      OH&S-WHS.Induction.Construction ACT
      OH&S-WHS.Induction.Construction NSW
      OH&S-WHS.Induction.Construction NT
      OH&S-WHS.Induction.Construction QLD
      OH&S-WHS.Induction.Construction SA
      OH&S-WHS.Induction.Construction TAS
      OH&S-WHS.Induction.Construction VIC
      OH&S-WHS.Induction.Construction WA

       

       

      Expand
      titleCode of Conduct
      Expand
      titleGeneric Business Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      codeofconduct
      codeofconduct
      Generic.Induction.Code of Conduct - signed off
      • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
      • Employee Conduct to be listed as complete on induction paperwork
      • Paperwork required is certificate of completion evidence issued by Lendlease
      • Either black and white or colour copies of certification is accepted
      • The issue date in Onsite should be recorded as the date of completion shown on the paperwork
      • The expiry date in Onsite should be recorded as the date which is calculated to be 12 months from the issue date

       

       

       

      Expand
      titleTelstra Project
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      codeofconduct
      codeofconduct
      Generic.Induction.Code of Conduct - signed off
      • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
      • Employee Conduct to be listed as complete on induction paperwork
      • Paperwork required is certificate of completion evidence issued by Lendlease
      • Either black and white or colour copies of certification is accepted
      • The issue date in Onsite should be recorded as the date of completion shown on the paperwork
      • The expiry date in Onsite should be recorded as the date which is calculated to be 12 months from the issue date

       

       

      Expand
      titleCriminal Record Checks
      Expand
      titleMetropolitan Business Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      criapproval
      criapproval
      Site.Access.CRI Approval
      • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
      • Downloadable template should be complete and uploaded.
        A copy of this form is available HERE
      • Pegasus staff click HERE to check the CRI Approvals Register - Applicant Name on form should match up with an approved applicant line entry on this register
      • The issue date in Onsite should be recorded as the date of CRI Approval shown on the CRI approvals register
      • The expiry date in Onsite should be recorded as 12 months from the issue date

       

       

      Expand
      titleInhouse Training
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      culturalawareness
      culturalawareness
      Inhouse.Trained.Cultural Awareness
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
      • Issue Date = Attendance Date


       

       Inhouse.Course.LLE.Engineering Management Systems 
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
       Issue Date = Attendance Date 
       Inhouse.Course.LLE.Introduction to Earthworks 
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
        Issue Date = Attendance Date 
       Inhouse.Course.LLE.Lead Auditor Training 
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
        Issue Date = Attendance Date 
       Inhouse.Course.LLE.Product Quality Risk Management 
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
         Issue Date = Attendance Date 
      Expand
      titleDefence Induction
      Expand
      titleGarden Island
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      gardenislanddefenceinduction
      gardenislanddefenceinduction
      Site.Induction.Garden Island Defence Induction

      Name must match the applicants,

      Must show completion of the base induction for HMAS Kuttabul

      • Issue Date = listed on the email
      • Expiry Date = 12 months from issue date

      Expand
      titleEngage and Influence
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      engageandinfluence
      engageandinfluence
      OH&S-WHS.Statement of Attendance.LLE - Engage & Influence
      • Name of document to match name registered in system
      • Statement of Attendance / Completion
      • Must contain the name of the Training organisation
      • Black and white or colour accepted
      • Issue Date = Attendance Date


       

      Expand
      titleGMR Stream 5
      Expand
      titleGeneric Business Rule

      Anchor
      stream5
      stream5

      CompetencyCompetency RequirementsUpload RequirementsExamples

      Site.Induction.Lendlease GMR Passport – Stream 5


      This induction is currently hosted by Lendlease and can be found by clicking here

      Note: You will be taken to an online learning platform where you will select “register” to create each worker profile (login and password) for individual access to the Lendlease Learning Management System. Once each worker has been added they will receive an email with their details to login and complete each induction.

      Helpful Tips: Lendlease recommends using the Google Chrome internet browser to complete this induction. For further information and to download the Lendlease GMR Toolkit for external online learners please click here


      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Stream 5 or higher (Such as Stream 4, Stream 3, Stream 2 or Stream 1) to be listed as complete on induction paperwork

      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      • A screenshot of the certificate CAN be accepted in lieu of scanned copy of document
      • Screenshot of GMR training taken via Learning Link can be accepted (See example document 2)

      Pegasus staff CLICK HERE to read additional business rule information prior to file verification

      The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork


      Expand
      titleNortham Solar Project Specific Business Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples

      Site.Induction.GMR 4 - Stream 5 - Passport

       



      • The Lendlease GMR Stream 5  is for contractor employees and direct blue collar hire and those with no access to Lendlease Learning Link.
      • The corporate/white collar/Management/Supervisory staff equivalent is the GMR passport which includes GMR stream 5.  
      • As a rule Northam Solar farm will accept the attached as evidence of GMR passport completion for white collar professionals.

      • This is accessed through Learning Link for Lendlease Management and direct employees. All modules must be completed.

      • ·      The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • ·         GMR Passport to be listed as complete on induction paperwork
      • ·         Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      Expand
      titleProject / Generic

      Generic.Induction.Working In Network Sites



      • The applicants name shown on this statement of completion needs to match the applicants registered name in Onsite
      • Working in Network Sites to be listed as complete on statement of completion
      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      The issue date in Onsite should be recorded as the date of completion shown on the statement of completion
      Anchor
      nbnhseawareness
      nbnhseawareness
      Project.Statement of Attainment.Completed NBN Enable Account
      The applicant’s name on enAble needs to match the applicant’s registered name in Onsite

      Screenshot of the enAble profile should be provided as such that it confirms the employee's name, enAble ID and the 2x compulsory online trainings are completed (refer to the attached images).These screenshots can be arranged from their profile either: 

      **ALSO SEE NOTE BELOW FOR NBN NSW ASSOCIATIONS

       

      Home page > Accreditation > Online training > View all details or

      Home page > Accreditation > table under enAble™ card creation

      nbn - Health, Safety and Environment (HSE) Awareness         Completed: Passed (100%)

      nbn - Your Role in Connecting Australia                                    Completed: Passed (100%)

       

      OR


      EnAble card is also accepted for this competency requirement as long as BOTH the front & back sides of the enAble card are uploaded

       

      ***PLEASE NOTE ****

      FOR NBN ASSOCIATIONS ONLY THE ENABLE MUST BE ACCOMPANIED BY an Enable Certificate of Verification issued by LL (for those with NBN NSW association only) - Both of these documents must be included within the same file upload

      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork or online training date listed
      • No expiry date is required to be recorded for this competency

      Anchor
      nbnutilitystrikes
      nbnutilitystrikes
      Electrical Trained Avoiding Utility Strikes(NBN EnAble profile)

      The applicants name on the enable needs to match the applicants registered name in onsite

      Evidence to be provided is a screenshot from the individuals enable profile showing 'Avoiding Utility Strikes' marked as Completed: Passed (100%).  

      *   This screenshot can be obtained from under "Accreditations' in an individual's enAble profile.

       
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork or online training date listed
      • No expiry date is required to be recorded for this competency
       
      Lendlease – S Group Induction
      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Certificate of completion OR training attendance sheet can be accepted
      • Induction Workshop to be listed as complete on induction paperwork
      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork

      Lendlease - S Frontline Leader Induction
      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Certificate of completion can be accepted
      • Introduction to leadership at Lendlease to be listed OR Front line leadership induction as complete on induction paperwork
      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      Anchor
      telco
      telco
      Project.Certificate.Telco EDP Permit Requestor Certificate
      • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite

      •  Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      Anchor
      gmr
      gmr
      Generic.Induction.GMR Passport
      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • GMR Passport to be listed as complete on induction paperwork
      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency

      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
       

      Anchor
      southeastinduction
      southeastinduction
      Site.Induction.South East Water Induction and Living Safely Rules


      Business Rule last updated 28.8.18

      • That the name on the certificate is the same or shortened version ie Andy for Andrew as the ID name
      • South East Water logo to be included
      • Living Safely Rules to be listed
      • Front and back of the card to be provided
      • Induction Card ID number to be included

      Issue Date not required

      Expiry Date - As listed on the induction card

      Anchor
      exxonmobilinduction
      exxonmobilinduction
      Site.Induction.Exxon Mobil Induction
      • Name on ticket/ Training register sheet to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible

      • Issue date to be recorded as the attendance date

       

       
      Anchor
      asiccardmelbourneairport
      asiccardmelbourneairport
      Site.Induction.ASIC Card Melbourne Airport
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded
      Anchor
      vivaparta
      vivaparta
      Site.Induction.VIVA - Part A
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible

      Issue date to be recorded

       

       
      Anchor
      vivapartb
      vivapartb
      Site.Induction.VIVA -
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded
      Anchor
      vivanewportinduction
      vivanewportinduction
      Site.Induction.VIVA Newport Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible

      Issue date to be recorded

       

       
      Anchor
      vivarefineryinduction
      vivarefineryinduction
      Site.Induction.VIVA Refinery Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded 

      Anchor
      melbournewaterinduction
      melbournewaterinduction
      Site.Induction.Melbourne Water Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded 
      Anchor
      air7000induction
      air7000induction
      Site.Induction.Air7000 Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded 
      Anchor
      citywestwaterinduction
      citywestwaterinduction
      Site.Induction.City West Water Contractor Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded
      Site.Induction.CUB Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Issue date to be recorded 
      Anchor
      transurban
      transurban
      Site.Induction.Transurban(CityLink) Induction
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible

      Issue date to be recorded

       

       
      Site.Licence.Defence Pass 

       

      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Black and white or colour acceptable
      • Must be clearly scanned and legible
      Expiry to be recorded = 31st of Month/Year on card
      Anchor
      sydneywater
      sydneywater
      Contractor.Induction.Sydney Water Contractor Induction Pass
      • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
      • Sydney Water logo to be included
      • Front and back of the card to be provided
      • Authorised representative site to be completed

      Issue Date - As listed on the card

      Expiry Date - As listed on the card

      Expand
      titlePart A and Part B Inductions

      Anchor
      partapartb
      partapartb

      Expand
      titleNational / Generic Business Rules
      CompetencyCompetency RequirementsUpload RequirementsExamples

      Anchor
      parta
      parta
      National.Induction.Lendlease Orientation - Part A

      This induction is currently hosted by Lendlease and can be found for

       Lendlease Services by clicking here

       Lendlease Building by clicking here

      Note: You will be taken to an online learning platform where you will select “register” to create each worker profile (login and password) for individual access to the Lendlease Learning Management System. Once each worker has been added they will receive an email with their details to login and complete each induction.

      Helpful Tips: Lendlease recommends using the Google Chrome internet browser to complete this induction. For further information and to download the Lendlease GMR Toolkit for external online learners please click here


       

       
      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Orientation Part A Building / Services or Engineering to be listed
      • Either black and white or colour copies of certification is accepted
      • NOTE:  Screenshots of Online Training System Completion Results are accepted in lieu of certificate (see example document 2)

      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      • Expiry Date = 3 years from date of completion

       


      Generic. Induction.Lendlease

      Induction- Part B

       

       

      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Either black and white or colour copy of example doc to be accepted
      • No expiry date is required to be recorded for this competency

      • The issue date in Onsite should be recorded as the date of completion/Todays date as shown on the upload
        

       

       

      Expand
      titlePower North Specific Business Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Site.Induction.Part B- Power North Site Induction


      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Either black and white or colour copy of example doc to be accepted
      • No expiry date is required to be recorded for this competency
      • Pegasus Staff MUST review the document against additional business rule information prior to verification which is available HERE
      • The issue date in Onsite should be recorded as the date of completion/Todays date as shown on the upload
       


      Expand
      titleNBN Specific Business Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples

      Project.Induction.Part B - Lendlease NBN Site Induction

      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Either black and white or colour copy of example doc to be accepted
      • No expiry date is required to be recorded for this competency
      • The issue date in Onsite should be recorded as the date of completion/Today's date as shown on the upload
       


      Expand
      titleONSP Project Specific Business Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples

      Lendlease ONSP Combined Part A and B Induction

      • Existing workers that have already been inducted will be allowed to upload a certificate that states that they have completed the Lendlease Part A and Part B induction on site.
      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • No expiry date is required to be recorded for this competency
      • All new workers will be asked to complete the Lendlease Part A Induction online and upload the certificate upon completion

      Link – http://onlinelearning.lendlease.com/building_orientation_part_A

      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      • Expiry Date = 3 years from date of completion
      Expand
      titleMates In Construction

      Anchor
      matesinconstruction
      matesinconstruction

      CompetencyCompetency RequirementsUpload RequirementsExamples
      Building & Construction.Course.Mates In Construction - General Awareness Training
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
       
      Building & Construction.Course.Mates In Construction - Connector Training
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
       
      Building & Construction.Course.Mates In Construction - Assist Worker Training
      • Name on Attendance List must match the name registered in system
      • Statement of Attendance or Copy of Attendance List
      •  The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
       
      Expand
      titleOperator
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      ausgrid
      ausgrid
      Operator.Induction.AusGrid Electrical Safety Rules *NSW Only*
      • The applicants name shown on this induction Card needs to match the applicants registered name in Onsite
      • AusGrid Electrical Safety Rules *NSW Only* to be listed as complete on induction paperwork
      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      Anchor
      endeavour
      endeavour
      Operator.Induction.Endeavour Electrical Safety Rules *NSW Only*
      • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
      • Endeavour Electrical Safety Rules *NSW Only* to be listed as complete on induction paperwork
      • Either black and white or colour copies of certification is accepted
      • No expiry date is required to be recorded for this competency
      • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
       
      Anchor
      energex
      energex
      Operator.Induction.Energex Network Induction *QLD Only*
      • The applicants name shown on this induction paperwork needs to match the applicant’s registered name in Onsite
      • Uploaded Energex Network Induction paperwork needs to display the signatory person’s name & signature as well
      • Either black and white or colour copies of certification is accepted
      • 5 years expiry date is required to be recorded for this competency

      • 5 years expiry date is required to be recorded for this competency

       

      ·     

      Expand
      titleSecurity
      Expand
      titleMetropolitan Remand and Reception Centre Specific Rule
      CompetencyCompetency RequirementsUpload RequirementsExamples
      Anchor
      mrrcsecurityawareness
      mrrcsecurityawareness
      Security.Awareness.Declaration.Contractors 
      • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
      • Document needs to be signed and dated by contractor

        Can we please add a hyperlink to the downloadable form where it stipulates available HERE

      • The issue date in Onsite should be recorded as the signed date on the security awareness document
      • No expiry required