CompetencyCompetency RequirementsUpload requirementsExamples
Safety.Induction.Open Cut and Generic ATUI FormClick HERE to access a copy of the form
  • The form should be fully completed to be accepted

  • All

    All 6 pages of the form must be

    included within the uploaded file
  • The role of the person is listed i.e. Operator / Coal loader.
  • The primary location must be listed.
  • The 'induction required' would ideally be listed on the form however if this has been missed in completing the form it can still be accepted
  • For sign off

    uploaded

    Page 1 

      • Name of inductee must match registering person
      • Position must be completed
      • Contractor Company must be completed
      • WHC Contract Owner or Coordinator email – NOT MANDATORY
      • Must select Primary WHC site  and all sections must be completed.
      • Induction(s) required – must be completed
      • Approval section:
        The contract owner or
    • Contract
      • coordinator
    • always
      • needs to be listed, they must sign and date.
        The mechanical or electrical is only required if the role is linked to any mechanical or electrical role
    • .
      The Manager of Mining engineering needs to sign for ALL underground trades and Operator for Narrabri
      • .
    •  NOTE: MME sign off not needed for surface role at Narrabri
      • The Manager of Mining engineering (MME) needs to sign
    • onto the form
      • for
    • anyone that selected
      • the role
    • titled
      • 'All Open Cut - Operator'.

    NOTE: Gunnedah CHPP does not have a MME – therefore this signature is not required for applicants that have indicated Gunnedah CHPP

    is

    as their primary WHC site even if the 'All Open Cut - Operator' role has been chosen.

    Page 2 

      • Inductions; Check list must be completed

    Only version 8 ,9 and 10 will be accepted.

    Note: The Whitehaven Coal Induction Information Form issued by Pegasus is not an acceptable form for this competency upload

     Page 3 

      • Roles; A role in the Open Cut section must be selected

    Page 4, 5 & 6 

      • Complete if applicable  

     