Page tree
Skip to end of metadata
Go to start of metadata

CompetencyCompetency RequirementsUpload RequirementsExamples

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (BSBDIV301)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Laing ORourke CSM Leadership Training Requirements Record is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RSW number to be recorded on sheet
  • Specific unit of competency must be shown on the sheet that aligns to this competency code
  • Approval section must be completed

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Laing ORourke CSM Leadership Training Requirements Record is uploaded:

Expiry date = Is NOT required



When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (BSBMGT401A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Laing ORourke CSM Leadership Training Requirements Record is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RSW number to be recorded on sheet
  • Specific unit of competency must be shown on the sheet that aligns to this competency code
  • Approval section must be completed

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Laing ORourke CSM Leadership Training Requirements Record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

 

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (BSBRSK401)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Laing ORourke CSM Leadership Training Requirements Record is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RSW number to be recorded on sheet
  • Specific unit of competency must be shown on the sheet that aligns to this competency code
  • Approval section must be completed

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Laing ORourke CSM Leadership Training Requirements Record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

 

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCBC4002A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCBC4012B)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:


Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCCM2001A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:


Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE3016A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE3017A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE3018A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE3019A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro S- Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE3020A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE3022A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE4001A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE4002A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE4003A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCDE4004A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCM2001A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (CPCCOHS2001A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (MEM16006A)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro- Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required



When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate


Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (MEM18002B)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro- Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (MSMWHS200)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (MSMWHS201)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIICOM201D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIIRIS201D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIISAM202D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIISAM203D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership


When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIISAM204D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIIUND310D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (RIIWHS201D)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (TLIC3037)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (TLIE1003)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney - Introduction to Leadership or RAIL stream

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (TLIE2007)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership or Rail stream

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (TLIE2029)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership or Rail stream

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (TLIF0078)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Training & Assessment.Statement of Attendance.SMIC Attendance / Transcript (TLIF2010)

When a Nationally recognised statement of attainment or transcript is uploaded:

Grouped competency selection should be the national statement of attainment unit of competency rather than the SMIC specific competency: Please CLICK HERE to be redirected to the national RIW statement of attainment business rule

When a Tafe issued participant results record is uploaded:

  • Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Specific unit of competency must be shown on the sheet that aligns to this competency code and title
  • Course information in the first section of the form completed in full (minimum of one trainer/assessor name to be stated)
  • Worker details in second section of the form – USI number, Employer, Signature and if they have been deemed Competent (anyone deemed Not Yet Competent should not be approved)
  • Last section of form to have trainer name and signature at the bottom of the page

When a Sydney Metro issued SMIC Interim Certificate is uploaded:

  • Applicant Name on sheet to match the name in the system (shortened versions accepted eg. ‘Chris’ accepted for Christopher)
  • Applicant RIW ID on this document must match Pegasus ID number in Onsite Track Easy
  • Certificate will display 'SMIC Interim Certificate' and relevant Sydney Metro - Introduction to Leadership or RAIL stream

When a Nationally recognised statement of attainment or transcript is uploaded:

Refer to national business rule for statement of attainments and transcripts for issue and expiry date information


When a Tafe issued participant results record is uploaded:

Expiry date = Is NOT required


When a Sydney Metro issued SMIC Interim Certificate is uploaded:

Expiry date = As displayed on the certificate

Tafe Participant Result Record:

Page Version: 38

Note: This Document is not version controlled when printed.

  • No labels