CompetencyCompetency RequirementsUpload RequirementsExamples
Electrical.Apprentice.Apprenticeship Training Contract as an Electrician from the Australian Apprenticeship Centre
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Authorised.Previously authorised with Category 1 – Disconnect and Reconnect as at the 30 December 2016 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Certificate III.UET30612 - Certificate III in ESI - Power Systems - Distribution Overhead (Linesman) 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Certificate III.UET30812 - Certificate III in ESI - Power Systems - Distribution Cable Jointing
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Induction.Ausgrid’s Electrical Safety Rules (ESRs) 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Qualified.Electrical Certificate or Licence 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Qualified.Electrical Qualification or Power System Distribution Cable Jointing
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Qualified.Electrical Qualification or Power System Distribution Overhead Linesman
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Qualified.Electrical Qualification or Power System Linesman/Cable Jointing
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.Install and replace power system meters and associated equipment 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRCJ21A – Lay ESI cables
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRCJ22A – Install and maintain de-energised low voltage underground paper insulated cables
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRCJ23A – Install and maintain de-energised high voltage underground paper insulated cables
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRCJ26A – Install and maintain de-energised low voltage underground polymeric cables
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRCJ27A – Install and maintain de-energised high voltage underground polymeric cables
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDREL14 - Working safely near live electrical apparatus as a non electrical worker 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDREL16 - Working safely near live electrical apparatus
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRIS55A – Install and maintain low voltage underground services
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRIS56A – Install and maintain low voltage overhead services
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF02 - Perform Pole Top Rescue 
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF03 - Perform EWP rescue
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF06 - Perform rescue from a live LV panel
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF08 - Perform EWP controlled descent escape
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF09 - Apply access procedures to work on or near electrical network infrastructure
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF10 - First Aid in an ESI Environment
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Electrical.Statement of Attainment.UETTDRRF11A – Testing of Connections to LV Electricity Networks
  • The date of completion on the evidence should be recorded as the Issue Date in Onsite

Page Version: 3

Note: This Document is not version controlled when printed.