Child pages
  • MACH Energy Business Rules | Construction Induction
Skip to end of metadata
Go to start of metadata

CompetencyCompetency RequirementsUpload  RequirementsExamples
OH&S-WHS.Induction.Construction Induction - White Card
  • Name on card to match the applicants registered name in Onsite
  • OHS Construction Induction to be listed
  • Only the front side of this card is required to be uploaded.
  • To be issued by the relevant / matching state authority:Workcover/ Safework / Worksafe
  • Statement of Attainment Accepted.
  • No expiry
  • Black and white or colour copies accepted
  • MACH Energy will accept the temporary white card evidence; whereby the individual receives a letter / statement (similar to a DL renewal or DL replacement) saying the replacement card will be issued within 60 days.


Digital screenshot of White card can be accepted:

  • Card number must be shown
  • Date of Issue must be shown
  • Full Name must be shown
  • DOB must be shown


  • Pegasus staff must Click Here and note this additional information prior to verification of this competency
  • Issue date: To be recorded in Onsite as shown on the card
  • Expiry date: Normally no expiry however 60 day expiry will occasionally be required to be add (only required when a form of temporary evidence has been uploaded).


Page Version: 25

Note: This Document is not version controlled when printed.

  • No labels