Page tree
#trackbackRdf

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Image RemovedImage Added


CompetencyCompetency RequirementsUpload RequirementsExamples

Generic.VOC.Verification of Competence for Role Declaration

Click here for downloadable TransGrid Transgrid VOC template

  • All fields on form must be completed

Acceptable evidence:

TransGrid issued VOC - Employer Declaration form

1. RTO Issued VOC

The applicants name shown on this document needs to match the applicants registered name in Onsite

The matching competency name needs to be displayed on document

Assessment must have been conducted by a Registered Training Organisation (RTO)

The issuing RTO must hold the correct authority to deliver that unit of competence

NOTE: The competency must be indicated on the Verification of Competency (VOC) as it is shown in this competency title – If there is a mismatch with regard to the competency naming used on the VOC compared to what is displayed as the competency title in Onsite, Pegasus will seek  site approval for the document.

Exception for VOC for crane operations – the VOC may include naming that includes the Crane Licence Code and Name

CO

C1

C6

C2

CV

CN

Slewing mobile crane (over 100 tonnes

Slewing mobile crane (up to 100 tonnes)

Slewing mobile crane (up to 60 tonnes)

Slewing mobile crane (up to 20 tonnes)

Vehicle loading crane

Non slewing mobile crane

 

 

 

2. Transgrid Issued VOC:

 

The applicants name shown on this document needs to match the applicants registered name in Onsite

The matching competency name needs to be displayed on document

 

 

3.Third Party Issued VOC - Subcontractor/Contractor/Other Training Provider (Not an RTO):

Only Third Parties on Transgrid’s approved list will be accepted:

Approved Third Party VOC

TCO Industries Pty Ltd

Consolidated Power Projects

Downer Group 

 

For those Third Parties who wish to have their VOC process added to Transgrid’s approved list please email leonie.mccallum@transgrid.com.au to arrange.


4.Employer Mobile Plant Competency Declaration

This is accepted for any Operator Plant VOC. Employer completes and submits a declaration that an employee meets all legislative requirements to operate nominated mobile plant and has maintained competence in the operation of the nominated mobile plant: Transgrid - Mobile Plant Operations Competency Declaration (jotform.com)












































Issue Date = VOC completion date

Expiry Date = Date which is calculated to be 5 years from VOC completion date

Pegasus Staff Only: CLICK HERE for additional business rule information that must be adhered to prior to file verification


Expiry date is to be recorded on all plant VOC 5 years from the date of issue. Please note even if an expiry date is listed this is still to be recorded as 5 years from date of issue.











































































Operator.VOC.Mobile Plant Verification of Competence ( VOC )Declaration

Click here for downloadable TransGrid VOC template

All mobile plant operation worker roles require a VOC every five years.

Acceptable evidence:

  • TransGrid issued VOC
  • VOC by external training provider
  • Applicants name to be shown on document
  • Applicants name on document must match cardholders registered name (However shortened versions of first names such as 'Chris' for 'Christopher' is acceptable)
  • VOC Plant Name/Type, date completed
  • Date certificate/card issued
  • Date certificate/card expires
  • Authorised person name or title (does not necessarily need a signature)
  • Issuing organisation’s logo / corporate identifier / unique watermark and / or document or certificate number
Mobile Plant Operations Declaration

Issue Date = VOC completion date

Expiry Date = Date which is calculated to be 5 years from VOC completion dateTransgrid VOC template

Operator Plant.VOC.ATV - 8 x 8 Avenger






































Operator Plant.VOC.ATV - Easements
Operator Plant.VOC.ATV - Substations
Operator Plant.VOC.ATV -Tracked Snow Mobile
Operator Plant.VOC.Backhoe
Operator Plant.VOC.Crane - Bridge / Gantry < 3 movements
Operator Plant.VOC.Crane - Bridge / Gantry > 3 movements
Operator Plant.VOC.Crane - Concrete Placing Boom
Operator Plant.VOC.Crane - Derrick
Operator Plant.VOC.Crane - Non Slewing Mobile Crane >3t
Operator Plant.VOC.Crane - Portal Boom Crane
Operator Plant.VOC.Crane - Self Erecting Crane
Operator Plant.VOC.Crane - Slewing <100t
Operator Plant.VOC.Crane - Slewing <20t
Operator Plant.VOC.Crane - Slewing <60t
Operator Plant.VOC.Crane - Slewing >100t
Operator Plant.VOC.Crane - Tower Crane
Operator Plant.VOC.Crane Operator - Vehicle Loading Crane < 10T
Operator Plant.VOC.Crane Operator - Vehicle Loading Crane > 10T
Operator Plant.VOC.Dozer
Operator Plant.VOC.EWP - Boom Type>11m
Operator Plant.VOC.EWP - Narrow Track >11m
Operator Plant.VOC.EWP - Personnel and Material Hoist
Operator Plant.VOC.EWP - Truck mounted >11m
Operator Plant.VOC.EWPA Yellow Card
Operator Plant.VOC.Excavator
Operator Plant.VOC.Excavator Non-Destructive Vacuum
Operator Plant.VOC.Forklift Operator
Operator Plant.VOC.Front End Loader (Track)
Operator Plant.VOC.Front End Loader (Wheel)
Operator Plant.VOC.Grader
Operator Plant.VOC.Integrated Tool Carrier
Operator Plant.VOC.Operator - Stringing Winch
Operator Plant.VOC.Operator - Winch
Operator Plant.VOC.Scraper
Operator Plant.VOC.Skid steer
Operator Plant.VOC.Telehandler < 3T (Plus various attachments)
Operator Plant.VOC.Telehandler > 3T (Plus various attachments)
Operator Plant.VOC.Tractor