Competency | Competency Requirements | Upload Requirements | Examples |
---|
Generic.VOC.Verification of Competence |
All mobile plant operation worker roles require a VOC every five years.
Acceptable evidence:
- TransGrid issued VOC
- VOC by external training provider
- Applicants name to be shown on document
- Applicants name on document must match cardholders registered name (However shortened versions of first names such as 'Chris' for 'Christopher' is acceptable)
- VOC Plant Name/Type, date completed
- Date certificate/card issued
- Date certificate/card expires
- Authorised person name or title (does not necessarily need a signature)
- Issuing organisation’s logo / corporate identifier / unique watermark and / or document or certificate number
for Role Declaration | 1. RTO Issued VOC The applicants name shown on this document needs to match the applicants registered name in Onsite The matching competency name needs to be displayed on document Assessment must have been conducted by a Registered Training Organisation (RTO) The issuing RTO must hold the correct authority to deliver that unit of competence NOTE: The competency must be indicated on the Verification of Competency (VOC) as it is shown in this competency title – If there is a mismatch with regard to the competency naming used on the VOC compared to what is displayed as the competency title in Onsite, Pegasus will seek site approval for the document. Exception for VOC for crane operations – the VOC may include naming that includes the Crane Licence Code and Name
2. Transgrid Issued VOC:
The applicants name shown on this document needs to match the applicants registered name in Onsite The matching competency name needs to be displayed on document
3.Third Party Issued VOC - Subcontractor/Contractor/Other Training Provider (Not an RTO): Only Third Parties on Transgrid’s approved list will be accepted: Approved Third Party VOC TCO Industries Pty Ltd Consolidated Power Projects Downer Group
For those Third Parties who wish to have their VOC process added to Transgrid’s approved list please email leonie.mccallum@transgrid.com.au to arrange. 4.Employer Mobile Plant Competency Declaration This is accepted for any Operator Plant VOC. Employer completes and submits a declaration that an employee meets all legislative requirements to operate nominated mobile plant and has maintained competence in the operation of the nominated mobile plant: Transgrid - Mobile Plant Operations Competency Declaration (jotform.com) | Issue Date = VOC completion date Expiry Date = Date which is calculated to be 5 years from VOC completion date Pegasus Staff Only: CLICK HERE for additional business rule information that must be adhered to prior to file verification | |||||||||||||
Operator.VOC.Mobile Plant VOC Declaration | |||||||||||||||
Operator Plant.VOC.ATV - 8 x 8 Avenger | |||||||||||||||
Operator Plant.VOC.ATV - Easements | |||||||||||||||
Operator Plant.VOC.ATV - Substations | |||||||||||||||
Operator Plant.VOC.ATV -Tracked Snow Mobile | |||||||||||||||
Operator Plant.VOC.Backhoe | |||||||||||||||
Operator Plant.VOC.Crane - Bridge / Gantry < 3 movements | |||||||||||||||
Operator Plant.VOC.Crane - Bridge / Gantry > 3 movements | |||||||||||||||
Operator Plant.VOC.Crane - Concrete Placing Boom | |||||||||||||||
Operator Plant.VOC.Crane - Derrick | |||||||||||||||
Operator Plant.VOC.Crane - Non Slewing Mobile Crane >3t | |||||||||||||||
Operator Plant.VOC.Crane - Portal Boom Crane | |||||||||||||||
Operator Plant.VOC.Crane - Self Erecting Crane | |||||||||||||||
Operator Plant.VOC.Crane - Slewing <100t | |||||||||||||||
Operator Plant.VOC.Crane - Slewing <20t | |||||||||||||||
Operator Plant.VOC.Crane - Slewing <60t | |||||||||||||||
Operator Plant.VOC.Crane - Slewing >100t | |||||||||||||||
Operator Plant.VOC.Crane - Tower Crane | |||||||||||||||
Operator Plant.VOC.Crane Operator - Vehicle Loading Crane < 10T | |||||||||||||||
Operator Plant.VOC.Crane Operator - Vehicle Loading Crane > 10T | |||||||||||||||
Operator Plant.VOC.Dozer | |||||||||||||||
Operator Plant.VOC.EWP - Boom Type>11m | |||||||||||||||
Operator Plant.VOC.EWP - Narrow Track >11m | |||||||||||||||
Operator Plant.VOC.EWP - Personnel and Material Hoist | |||||||||||||||
Operator Plant.VOC.EWP - Truck mounted >11m | |||||||||||||||
Operator Plant.VOC.EWPA Yellow Card | |||||||||||||||
Operator Plant.VOC.Excavator | |||||||||||||||
Operator Plant.VOC.Excavator Non-Destructive Vacuum | |||||||||||||||
Operator Plant.VOC.Forklift Operator | |||||||||||||||
Operator Plant.VOC.Front End Loader (Track) | |||||||||||||||
Operator Plant.VOC.Front End Loader (Wheel) | |||||||||||||||
Operator Plant.VOC.Grader | |||||||||||||||
Operator Plant.VOC.Integrated Tool Carrier | |||||||||||||||
Operator Plant.VOC.Operator - Stringing Winch | |||||||||||||||
Operator Plant.VOC.Operator - Winch | |||||||||||||||
Operator Plant.VOC.Scraper | |||||||||||||||
Operator Plant.VOC.Skid steer | |||||||||||||||
Operator Plant.VOC.Telehandler < 3T (Plus various attachments) | |||||||||||||||
Operator Plant.VOC.Telehandler > 3T (Plus various attachments) | |||||||||||||||
Operator Plant.VOC.Tractor |