Page tree
#trackbackRdf

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Expand
titleConstruction Induction CardAusgrid

Anchor
OHSconstructioncardausgridinductionsOHSconstructioncard
ausgridinductions

expand

 

title
Competency
Generic Business Rule
Competency Requirements
Competency Requirements (Redirection Link)OH&S-WHS.Induction.Work Safely in the Construction Industry  Click here for a list of national business rules relating to these competencies                 OH&S-WHS.Induction.Construction ACT OH&S-WHS.Induction.Construction NSW OH&S-WHS.Induction.Construction NTOH&S-WHS.Induction.Construction QLDOH&S-WHS.Induction.Construction SAOH&S-WHS.Induction.Construction TASOH&S-WHS.Induction.Construction VIC OH&S-WHS.Induction.Construction WA Expand
titleONSP Project Specific Business Rule
AnchorONSPOHSconstructioncardONSPOHSconstructioncard

 

CompetencyCompetency RequirementsUpload Requirements
OH&S-WHS.Induction.Work Safely in the Construction Industry
  • Only Construction Induction cards completed through classroom training are to be accepted.
  • No white cards completed by online training providers will be accepted.
  • Name on card to match the applicants registered name in Onsite
  • OHS Construction Induction to be listed
  • Only the front side of this card is required to be uploaded.
  • To be issued by the relevant / matching state authority:To be issued by the relevant / matching state authority:Workcover/ Safework / Worksafe NSW
  • Black and white or colour copies accepted
  • Pegasus Staff MUST review the document against additional business rule information prior to verification which is available HERE
  • Date of Completion to be recorded in Onsite as the Issue Date
  • No expiry is required to be entered.
OH&S-WHS.Induction.Construction ACT
OH&S-WHS.Induction.Construction NSW
OH&S-WHS.Induction.Construction NT
OH&S-WHS.Induction.Construction QLD
OH&S-WHS.Induction.Construction SA
OH&S-WHS.Induction.Construction TAS
OH&S-WHS.Induction.Construction VIC
OH&S-WHS.Induction.Construction WA

 

 

Expand
titleCode of Conduct
Expand
titleGeneric Business Rule
CompetencyCompetency RequirementsUpload RequirementsExamples AnchorcodeofconductcodeofconductGeneric.Induction.Code of Conduct - signed off
  • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
  • Employee Conduct to be listed as complete on induction paperwork
  • Paperwork required is certificate of completion evidence issued by Lendlease
  • Either black and white or colour copies of certification is accepted
  • The issue date in Onsite should be recorded as the date of completion shown on the paperwork
  • The expiry date in Onsite should be recorded as the date which is calculated to be 12 months from the issue date

Image Removed

 

 

 

Expand
titleTelstra Project
CompetencyCompetency RequirementsUpload RequirementsExamples AnchorcodeofconductcodeofconductGeneric.Induction.Code of Conduct - signed off
  • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
  • Employee Conduct to be listed as complete on induction paperwork
  • Paperwork required is certificate of completion evidence issued by Lendlease
  • Either black and white or colour copies of certification is accepted
  • The issue date in Onsite should be recorded as the date of completion shown on the paperwork
  • The expiry date in Onsite should be recorded as the date which is calculated to be 12 months from the issue date

Image Removed

Image Removed

 

 

Expand
titleCriminal Record Checks
Expand
titleMetropolitan Business Rule
CompetencyCompetency RequirementsUpload RequirementsExamples AnchorcriapprovalcriapprovalSite.Access.CRI Approval
  • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
  • Downloadable template should be complete and uploaded.
    A copy of this form is available HERE
  • Pegasus staff click HERE to check the CRI Approvals Register - Applicant Name on form should match up with an approved applicant line entry on this register
  • The issue date in Onsite should be recorded as the date of CRI Approval shown on the CRI approvals register
  • The expiry date in Onsite should be recorded as 12 months from the issue date

Image Removed

 

 

Expand
titleInhouse Training
CompetencyCompetency RequirementsUpload RequirementsExamples AnchorculturalawarenessculturalawarenessInhouse.Trained.Cultural Awareness
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
  • Issue Date = Attendance Date

 

 Inhouse.Course.LLE.Engineering Management Systems 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
 Issue Date = Attendance Date  Inhouse.Course.LLE.Introduction to Earthworks 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
  Issue Date = Attendance Date  Inhouse.Course.LLE.Lead Auditor Training 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
  Issue Date = Attendance Date  Inhouse.Course.LLE.Product Quality Risk Management 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
   Issue Date = Attendance Date  Expand
titleDefence Induction
ExpandtitleGarden Island
Upload RequirementsExamples

Company.Induction.Ausgrid Safety Rules

 Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:
        Applicant Name

 

Uploaded document must also include page of passport that shows ‘Safety Rules’ as having been achieved with:
        Ausgrid stamp being shown on this page
        Date of Training
        Trainer / Assessor Name
        Signature

 Ausgrid Certificate of Completion is accepted. It must show:
        Ausgrid Safety Rules
        Contractors Name
        Date of completion

Record the Issue date within Onsite:

 Completion date - if listed on certificate (this completion date is always used when displayed)
 Issue date - If only an issue date is listed please enter this as the issue date

 

 

 

 

 

 

 

Company.Induction.Ausgrid Environmental Awareness

Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:
        Applicant Name
    Uploaded document must also include page of passport that shows ‘Environmental’ as having been achieved with:
        Ausgrid stamp being shown on this page
        Date of Training
        Trainer / Assessor Name
        Signature
    Ausgrid Certificate of Completion is accepted. It must show:
        Environmental Management and Sustainability
        Contractors Name
        Date of completion
Record the Issue date within Onsite:

    Completion date - if listed on certificate (this completion date is always used when displayed)
    Issue date - If only an issue date is listed please enter this as the issue date
 
Company.Induction.Ausgrid Network Access Procedures
    Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:
        Applicant Name
    Uploaded document must also include page of passport that shows ‘Network Access procedures’ as having been achieved with:
        Ausgrid stamp being shown on this page
        Date of Training
        Trainer / Assessor Name
        Signature
    Ausgrid Certificate of Completion is accepted. It must show:
       Network Access Procedures
        Contractors Name
        Date of completion

Record the Issue date within Onsite:

    Completion date - if listed on certificate (this completion date is always used when displayed)
    Issue date - If only an issue date is listed please enter this as the issue date

 
Expand
titleConstruction Induction Card

Anchor
OHSconstructioncard
OHSconstructioncard

Expand
titleGeneric Business Rule
CompetencyCompetency Requirements (Redirection Link)
OH&S-WHS.Induction.Work Safely in the Construction Industry  Click here for a list of national business rules relating to these competencies                 
OH&S-WHS.Induction.Construction ACT
OH&S-WHS.Induction.Construction NSW
OH&S-WHS.Induction.Construction NT
OH&S-WHS.Induction.Construction QLD
OH&S-WHS.Induction.Construction SA
OH&S-WHS.Induction.Construction TAS
OH&S-WHS.Induction.Construction VIC
OH&S-WHS.Induction.Construction WA
Expand
titleONSP Project Specific Business Rule
Anchor
ONSPOHSconstructioncard
ONSPOHSconstructioncard

 

CompetencyCompetency RequirementsUpload Requirements
OH&S-WHS.Induction.Work Safely in the Construction Industry
  • Only Construction Induction cards completed through classroom training are to be accepted.
  • No white cards completed by online training providers will be accepted.
  • Name on card to match the applicants registered name in Onsite
  • OHS Construction Induction to be listed
  • Only the front side of this card is required to be uploaded.
  • To be issued by the relevant / matching state authority:To be issued by the relevant / matching state authority:Workcover/ Safework / Worksafe NSW
  • Black and white or colour copies accepted
  • Pegasus Staff MUST review the document against additional business rule information prior to verification which is available HERE
  • Date of Completion to be recorded in Onsite as the Issue Date
  • No expiry is required to be entered.
OH&S-WHS.Induction.Construction ACT
OH&S-WHS.Induction.Construction NSW
OH&S-WHS.Induction.Construction NT
OH&S-WHS.Induction.Construction QLD
OH&S-WHS.Induction.Construction SA
OH&S-WHS.Induction.Construction TAS
OH&S-WHS.Induction.Construction VIC
OH&S-WHS.Induction.Construction WA

 

 

 

 

Engage and Influence
Expand
titleCode of Conduct
title
Expand
titleGeneric Business Rule
CompetencyCompetency RequirementsUpload RequirementsExamples
Anchor
codeofconduct
codeofconduct
Generic.Induction.Code of Conduct - signed off
  • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
  • Employee Conduct to be listed as complete on induction paperwork
  • Paperwork required is certificate of completion evidence issued by Lendlease
  • Either black and white or colour copies of certification is accepted
  • The issue date in Onsite should be recorded as the date of completion shown on the paperwork
  • The expiry date in Onsite should be recorded as the date which is calculated to be 12 months from the issue date

Image Added

 

 

 

Expand
titleTelstra Project
CompetencyCompetency RequirementsUpload RequirementsExamples
Anchor
gardenislanddefenceinductioncodeofconductgardenislanddefenceinduction
codeofconduct
SiteGeneric.Induction.Garden Island Defence Induction
Name must Code of Conduct - signed off
  • The applicants name shown on this paperwork needs to match the applicants
,

Must show completion of the base induction for HMAS Kuttabul

  • Issue Date = listed on the email
  • Expiry Date = 12 months from issue date

Image Removed

Image Removed

Expand
  • registered name in Onsite
  • Employee Conduct to be listed as complete on induction paperwork
  • Paperwork required is certificate of completion evidence issued by Lendlease
  • Either black and white or colour copies of certification is accepted
  • The issue date in Onsite should be recorded as the date of completion shown on the paperwork
  • The expiry date in Onsite should be recorded as the date which is calculated to be 12 months from the issue date

Image Added

Image Added

 

 

Expand
titleCriminal Record Checks
Expand
titleMetropolitan Business Rule
CompetencyCompetency RequirementsUpload RequirementsExamples
Anchor
engageandinfluence
Expand
titleGeneric Business Rule
Anchor
stream5stream5
Competency
Competency
criapproval
engageandinfluenceOH&S-WHS.Statement of Attendance.LLE - Engage & Influence
  • Name of document to match name registered in system
  • Statement of Attendance / Completion
  • Must contain the name of the Training organisation
  • Black and white or colour accepted
  • Issue Date = Attendance Date

 

Expand
titleGMR Stream 5
criapproval
Site.Access.CRI Approval
  • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
  • Downloadable template should be complete and uploaded.
    A copy of this form is available HERE
  • Pegasus staff click HERE to check the CRI Approvals Register - Applicant Name on form should match up with an approved applicant line entry on this register
  • The issue date in Onsite should be recorded as the date of CRI Approval shown on the CRI approvals register
  • The expiry date in Onsite should be recorded as 12 months from the issue date

Image Added

 

 

Image Removed

Image Removed

Image Removed

Northam Solar Project Specific Business Rule
Expand
titleInhouse Training
CompetencyCompetency RequirementsUpload RequirementsExamples

Site.Induction.Lendlease GMR Passport – Stream 5

This induction is currently hosted by Lendlease and can be found by clicking here

Note: You will be taken to an online learning platform where you will select “register” to create each worker profile (login and password) for individual access to the Lendlease Learning Management System. Once each worker has been added they will receive an email with their details to login and complete each induction.

Helpful Tips: Lendlease recommends using the Google Chrome internet browser to complete this induction. For further information and to download the Lendlease GMR Toolkit for external online learners please click here

  • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
  • Stream 5 or higher (Such as Stream 4, Stream 3, Stream 2 or Stream 1) to be listed as complete on induction paperwork

  • Either black and white or colour copies of certification is accepted
  • No expiry date is required to be recorded for this competency
  • A screenshot of the certificate CAN be accepted in lieu of scanned copy of document
  • Screenshot of GMR training taken via Learning Link can be accepted (See example document 2)

Pegasus staff CLICK HERE to read additional business rule information prior to file verification

The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork

Expand
title
Anchor
culturalawareness
culturalawareness
Inhouse.Trained.Cultural Awareness
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
  • Issue Date = Attendance Date


 

 Inhouse.Course.LLE.Engineering Management Systems 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
 Issue Date = Attendance Date 
 Inhouse.Course.LLE.Introduction to Earthworks 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
  Issue Date = Attendance Date 
 Inhouse.Course.LLE.Lead Auditor Training 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
  Issue Date = Attendance Date 
 Inhouse.Course.LLE.Product Quality Risk Management 
  • Name on Attendance List must match the name registered in system
  • Statement of Attendance or Copy of Attendance List
   Issue Date = Attendance Date 
Project.Statement of Attainment.Completed NBN Enable AccountThe applicant’s name on enAble needs to match the applicant’s registered name in Onsite

Screenshot of the enAble profile should be provided as such that it confirms the employee's name, enAble ID and the 2x compulsory online trainings are completed (refer to the attached images).These screenshots can be arranged from their profile either: 

**ALSO SEE NOTE BELOW FOR NBN NSW ASSOCIATIONS

 

Home page > Accreditation > Online training > View all details or

Home page > Accreditation > table under enAble™ card creation

nbn - Health, Safety and Environment (HSE) Awareness         Completed: Passed (100%)

nbn - Your Role in Connecting Australia                                    Completed: Passed (100%)

 

OR

EnAble card is also accepted for this competency requirement as long as BOTH the front & back sides of the enAble card are uploaded

 

***PLEASE NOTE ****

FOR NBN ASSOCIATIONS ONLY THE ENABLE MUST BE ACCOMPANIED BY an Enable Certificate of Verification issued by LL (for those with NBN NSW association only) - Both of these documents must be included within the same file upload

Electrical Trained Avoiding Utility Strikes(NBN EnAble profile)The applicants name on the enable
Expand
titleDefence Induction

Generic.Induction.Working In Network Sites

  • The applicants name shown on this statement of completion needs to match the applicants registered name in Onsite
  • Working in Network Sites to be listed as complete on statement of completion
  • Either black and white or colour copies of certification is accepted
  • No expiry date is required to be recorded for this competency
The issue date in Onsite should be recorded as the date of completion shown on the statement of completionImage Removed
Anchor
nbnhseawarenessnbnhseawareness
  • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork or online training date listed
  • No expiry date is required to be recorded for this competency

Image Removed

Image Removed

Image Removed

Image Removed

Anchor
nbnutilitystrikesnbnutilitystrikes
Expand
titleGarden Island
CompetencyCompetency RequirementsUpload RequirementsExamples
Anchor
gardenislanddefenceinduction
gardenislanddefenceinduction
Site.Induction.
GMR 4 - Stream 5 - Passport

 

  • The Lendlease GMR Stream 5  is for contractor employees and direct blue collar hire and those with no access to Lendlease Learning Link.
  • The corporate/white collar/Management/Supervisory staff equivalent is the GMR passport which includes GMR stream 5.  
  • As a rule Northam Solar farm will accept the attached as evidence of GMR passport completion for white collar professionals.

  • This is accessed through Learning Link for Lendlease Management and direct employees. All modules must be completed.

  • ·      The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
  • ·         GMR Passport to be listed as complete on induction paperwork
  • ·         Either black and white or colour copies of certification is accepted
  • No expiry date is required to be recorded for this competency
  • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
Image Removed
Expand
titleProject / Generic
Garden Island Defence Induction

Name must match the applicants,

Must show completion of the base induction for HMAS Kuttabul

  • Issue Date = listed on the email
  • Expiry Date = 12 months from issue date

Image Added

Image Added

Expand
titleEngage and Influence
CompetencyCompetency RequirementsUpload RequirementsExamples
Anchor
engageandinfluence
engageandinfluence
OH&S-WHS.Statement of Attendance.LLE - Engage & Influence
  • Name of document to match name registered in system
  • Statement of Attendance / Completion
  • Must contain the name of the Training organisation
  • Black and white or colour accepted
  • Issue Date = Attendance Date


 

The applicants name shown on this induction paperwork
Expand
titleGMR Stream 5
Expand
titleGeneric Business Rule

Anchor
stream5
stream5

CompetencyCompetency RequirementsUpload RequirementsExamples

Site.Induction.Lendlease GMR Passport – Stream 5


This induction is currently hosted by Lendlease and can be found by clicking here

Note: You will be taken to an online learning platform where you will select “register” to create each worker profile (login and password) for individual access to the Lendlease Learning Management System. Once each worker has been added they will receive an email with their details to login and complete each induction.

Helpful Tips: Lendlease recommends using the Google Chrome internet browser to complete this induction. For further information and to download the Lendlease GMR Toolkit for external online learners please click here


  • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
  • Stream 5 or higher (Such as Stream 4, Stream 3, Stream 2 or Stream 1) to be listed as complete on induction paperwork

  • Either black and white or colour copies of certification is accepted
  • No expiry date is required to be recorded for this competency
  • A screenshot of the certificate CAN be accepted in lieu of scanned copy of document
  • Screenshot of GMR training taken via Learning Link can be accepted (See example document 2)

Pegasus staff CLICK HERE to read additional business rule information prior to file verification

The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork

Image Added

Image Added

Image Added


Expand
titleNortham Solar Project Specific Business Rule
CompetencyCompetency RequirementsUpload RequirementsExamples

Site.Induction.GMR 4 - Stream 5 - Passport

 



  • The Lendlease GMR Stream 5  is for contractor employees and direct blue collar hire and those with no access to Lendlease Learning Link.
  • The corporate/white collar/Management/Supervisory staff equivalent is the GMR passport which includes GMR stream 5.  
  • As a rule Northam Solar farm will accept the attached as evidence of GMR passport completion for white collar professionals.

  • This is accessed through Learning Link for Lendlease Management and direct employees. All modules must be completed.

  • ·      The applicants name shown on this induction paperwork needs to match the applicants registered name in
onsite

Evidence to be provided is a screenshot from the individuals enable profile showing 'Avoiding Utility Strikes' marked as Completed: Passed (100%).  

*   This screenshot can be obtained from under "Accreditations' in an individual's enAble profile.

 
  • Onsite
  • ·         GMR Passport to be listed as complete on induction paperwork
  • ·         Either black and white or colour copies of certification is accepted
  • No expiry date is required to be recorded for this competency
  • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
or online training date listed
  • No expiry date is required to be recorded for this competency
  •  Image RemovedLendlease – S Group Induction
    National.Induction.Lendlease Orientation - Part A

    This induction is currently hosted by Lendlease and can be found for

     Lendlease Services by clicking here

     Lendlease Building by clicking here

    Note: You will be taken to an online learning platform where you will select “register” to create each worker profile (login and password) for individual access to the Lendlease Learning Management System. Once each worker has been added they will receive an email with their details to login and complete each induction.

    Helpful Tips: Lendlease recommends using the Google Chrome internet browser to complete this induction. For further information and to download the Lendlease GMR Toolkit for external online learners please click here
    Expand
    titleProject / Generic
    Anchor
    partapartbpartapartb
    Expand
    titleNational / Generic Business Rules
    CompetencyCompetency RequirementsUpload RequirementsExamples
    Anchor
    partaparta
    The applicants name shown on this induction paperwork applicants
  • Certificate of completion can be accepted
  • Introduction to leadership at Lendlease to be listed OR Front line leadership induction as complete on induction paperwork
  • Either black and white or colour copies of certification is accepted
  • No expiry date is required to be recorded for this competency
  • Project.Certificate.Telco EDP Permit Requestor CertificateGeneric.Induction.GMR Passport
  • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
  • GMR Passport to be listed as complete on induction paperwork
  • Either black and white or colour copies of certification is accepted

    Screenshot of the enAble profile should be provided as such that it confirms the employee's name, enAble ID and the 2x compulsory online trainings are completed (refer to the attached images).These screenshots can be arranged from their profile either: 

    **ALSO SEE NOTE BELOW FOR NBN NSW ASSOCIATIONS

     

    Home page > Accreditation > Online training > View all details or

    Home page > Accreditation > table under enAble™ card creation

    nbn - Health, Safety and Environment (HSE) Awareness         Completed: Passed (100%)

    nbn - Your Role in Connecting Australia                                    Completed: Passed (100%)

     

    OR


    EnAble card is also accepted for this competency requirement as long as BOTH the front & back sides of the enAble card are uploaded

     

    ***PLEASE NOTE ****

    FOR NBN ASSOCIATIONS ONLY THE ENABLE MUST BE ACCOMPANIED BY an Enable Certificate of Verification issued by LL (for those with NBN NSW association only) - Both of these documents must be included within the same file upload

    Site.Induction.South East Water Induction and Living Safely Rules

    Business Rule last updated 28.8.18

  • That the name on the certificate is the same or shortened version ie Andy for Andrew as the ID name
  • South East Water logo to be included
  • Living Safely Rules to be listed
  • Front and back of the card to be provided
  • Induction Card ID number to be included
    Site.Induction.Exxon Mobil InductionSite.Induction.ASIC Card Melbourne AirportSite.Induction.VIVA - Part ASite.Induction.VIVA - Site.Induction.VIVA Newport InductionSite.Induction.VIVA Refinery InductionName on ticket

    Generic.Induction.Working In Network Sites



    • The applicants name shown on this statement of completion needs to match the applicants registered name in Onsite
    • Certificate of completion OR training attendance sheet can be accepted
    • Induction Workshop Working in Network Sites to be listed as complete on induction paperworkstatement of completion
    • Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    The issue date in Onsite should be recorded as the date of completion shown on the induction paperworkstatement of completionImage Modified

    Image Removed

    Lendlease - S Frontline Leader Induction
    Anchor
    nbnhseawareness
    nbnhseawareness
    Project.Statement of Attainment.Completed NBN Enable Account
    The applicant’s name on enAble needs to match the applicant’s registered name in Onsite

    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
    Image Removed
    Anchor
    telcotelco
    • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite

    •  Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    The issue date in Onsite should be recorded as the date of completion shown on the induction paperworkImage Removed
    Anchor
    gmrgmr
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork or online training date listed
    • No expiry date is required to be recorded for this competency
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
     

    Image Added

    Image Added

    Image Added

    Image Added

    Anchor
    southeastinduction
    nbnutilitystrikes
    southeastinduction

    Issue Date not required

    Expiry Date - As listed on the induction card

    Image Removed
    Anchor
    exxonmobilinductionexxonmobilinduction
    • Name on ticket/ Training register sheet to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    • Issue date to be recorded as the attendance date

     

     
    Anchor
    asiccardmelbourneairportasiccardmelbourneairport
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recordedImage Removed
    Anchor
    vivapartavivaparta
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    Issue date to be recorded

     

     
    Anchor
    vivapartbvivapartb
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recordedImage Removed
    Anchor
    vivanewportinductionvivanewportinduction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    Issue date to be recorded

     

     
    Anchor
    vivarefineryinductionvivarefineryinduction
    nbnutilitystrikes
    Electrical Trained Avoiding Utility Strikes(NBN EnAble profile)

    The applicants name on the enable needs to match the applicants registered name in onsite

    Evidence to be provided is a screenshot from the individuals enable profile showing 'Avoiding Utility Strikes' marked as Completed: Passed (100%).  

    *   This screenshot can be obtained from under "Accreditations' in an individual's enAble profile.

     
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork or online training date listed
    • No expiry date is required to be recorded for this competency
     Image AddedLendlease – S Group Induction
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • Certificate of completion OR training attendance sheet can be accepted
    • Induction Workshop to be listed as complete on induction paperwork
    • Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork

    Image Added

    Image Added

    Lendlease - S Frontline Leader Induction
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • Certificate of completion can be accepted
    • Introduction to leadership at Lendlease to be listed OR Front line leadership induction as complete on induction paperwork
    • Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
    Image Added
    Anchor
    telco
    telco
    Project.Certificate.Telco EDP Permit Requestor Certificate
    • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite

    •  Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    The issue date in Onsite should be recorded as the date of completion shown on the induction paperworkImage Added
    Anchor
    gmr
    gmr
    Generic.Induction.GMR Passport
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • GMR Passport to be listed as complete on induction paperwork
    • Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency

    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
     

    Anchor
    southeastinduction
    southeastinduction
    Site.Induction.South East Water Induction and Living Safely Rules


    Business Rule last updated 28.8.18

    • That the name on the certificate is the same or shortened version ie Andy for Andrew as the ID name
    • South East Water logo to be included
    • Living Safely Rules to be listed
    • Front and back of the card to be provided
    • Induction Card ID number to be included

    Issue Date not required

    Expiry Date - As listed on the induction card

    Image Added
    Anchor
    exxonmobilinduction
    exxonmobilinduction
    Site.Induction.Exxon Mobil Induction
    • Name on ticket/ Training register sheet to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    • Issue date to be recorded as the attendance date

     

     
    Anchor
    melbournewaterinduction
    asiccardmelbourneairport
    melbournewaterinduction
    asiccardmelbourneairport
    Site.Induction.ASIC Card Melbourne
    Water InductionAirport
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recorded Image Added
    Anchor
    air7000inductionvivapartaair7000induction
    vivaparta
    Site.Induction.Air7000 InductionVIVA - Part A
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    Issue date to be recorded

     

     
    Anchor
    citywestwaterinduction
    vivapartb
    citywestwaterinduction
    vivapartb
    Site.Induction.
    City West Water Contractor InductionVIVA -
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recorded
    Anchor
    vivanewportinduction
    vivanewportinduction
    Site.Induction.
    CUB VIVA Newport Induction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    Issue date to be recorded

     

     
    Anchor
    transurban
    vivarefineryinduction
    transurban
    vivarefineryinduction
    Site.Induction.
    Transurban(CityLink) VIVA Refinery Induction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recorded  Image Removed
    Anchor
    melbournewaterinduction
    melbournewaterinduction
    Site.
    Licence.Defence Pass 

     

    Induction.Melbourne Water Induction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Expiry Issue date to be recorded = 31st of Month/Year on cardImage Removed 
    Anchor
    sydneywater
    air7000induction
    sydneywater
    air7000induction
    ContractorSite.Induction.Sydney Water Contractor Air7000 Induction Pass
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Sydney Water logo to be included
    • Front and back of the card to be provided
    • Authorised representative site to be completed

    Issue Date - As listed on the card

    Expiry Date - As listed on the card

    Image Removed
    Expand
    titlePart A and Part B Inductions
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recorded 
    Anchor
    citywestwaterinduction
    citywestwaterinduction
    Site.Induction.City West Water Contractor Induction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recordedImage Added
    Site.Induction.CUB Induction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Issue date to be recorded 
    Anchor
    transurban
    transurban
    Site.Induction.Transurban(CityLink) Induction
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible

    Issue date to be recorded

     

     Image Added
    Site.Licence.Defence Pass 

     

    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Black and white or colour acceptable
    • Must be clearly scanned and legible
    Expiry to be recorded = 31st of Month/Year on cardImage Added
    Anchor
    sydneywater
    sydneywater
    Contractor.Induction.Sydney Water Contractor Induction Pass
    • Name on ticket to match the person registered (However shortened first names such as 'Chris' for 'Christopher' are accepted)
    • Sydney Water logo to be included
    • Front and back of the card to be provided
    • Authorised representative site to be completed

    Issue Date - As listed on the card

    Expiry Date - As listed on the card

    Image Added
    Expand
    titlePart A and Part B Inductions

    Anchor
    partapartb
    partapartb

    Expand
    titleNational / Generic Business Rules
    CompetencyCompetency RequirementsUpload RequirementsExamples

    Anchor
    parta
    parta
    National.Induction.Lendlease Orientation - Part A

    This induction is currently hosted by Lendlease and can be found for

     Lendlease Services by clicking here

     Lendlease Building by clicking here

    Note: You will be taken to an online learning platform where you will select “register” to create each worker profile (login and password) for individual access to the Lendlease Learning Management System. Once each worker has been added they will receive an email with their details to login and complete each induction.

    Helpful Tips: Lendlease recommends using the Google Chrome internet browser to complete this induction. For further information and to download the Lendlease GMR Toolkit for external online learners please click here


     

     
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • Orientation Part A Building / Services or Engineering to be listed
    • Either black and white or colour copies of certification is accepted
    • NOTE:  Screenshots of Online Training System Completion Results are accepted in lieu of certificate (see example document 2)

    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
    • Expiry Date = 3 years from date of completion

     


    Generic. Induction.Lendlease

    Induction- Part B

     

     

    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • Orientation Part A Building / Services or Engineering to be listed
    • Either black and white or colour copies of certification is accepted
    • NOTE:  Screenshots of Online Training System Completion Results are accepted in lieu of certificate (see example document 2)name in Onsite
    • Either black and white or colour copy of example doc to be accepted
    • No expiry date is required to be recorded for this competency

    • The issue date in Onsite should be recorded as the date of completion/Todays date as shown on the induction paperwork
    • Expiry Date = 3 years from date of completion

     

    Generic. Induction.Lendlease

    Induction- Part B

     

     

    • upload
     Image Added 

     

     

    Expand
    titlePower North Specific Business Rule
     
    CompetencyCompetency RequirementsUpload RequirementsExamples
    Site.Induction.Part B- Power North Site Induction


    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • Either black and white or colour copy of example doc to be accepted
    • No expiry date is required to be recorded for this competency
    • Pegasus Staff MUST review the document against additional business rule information prior to verification which is available HERE
    • The issue date in Onsite should be recorded as the date of completion/Todays date as shown on the upload
     Image Modified

     

     


    Expand
    titlePower North NBN Specific Business Rule
    CompetencyCompetency RequirementsUpload RequirementsExamples
    Site

    Project.Induction.Part B -

    Power North

    Lendlease NBN Site Induction

    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • Either black and white or colour copy of example doc to be accepted
    • No expiry date is required to be recorded for this competencyPegasus Staff MUST review the document against additional business rule information prior to verification which is available HERE
    • The issue date in Onsite should be recorded as the date of completion/Todays Today's date as shown on the upload
     


    Expand
    titleNBN ONSP Project Specific Business Rule
    CompetencyCompetency RequirementsUpload RequirementsExamples

    Project.Induction.Part B - Lendlease NBN Site InductionLendlease ONSP Combined Part A and B Induction

    • Existing workers that have already been inducted will be allowed to upload a certificate that states that they have completed the Lendlease Part A and Part B induction on site.
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in OnsiteEither black and white or colour copy of example doc to be acceptedpaperwork needs to match the applicants registered name in Onsite
    • No expiry date is required to be recorded for this competency
    • All new workers will be asked to complete the Lendlease Part A Induction online and upload the certificate upon completion

    Link – http://onlinelearning.lendlease.com/building_orientation_part_A

    • The issue date in Onsite should be recorded as the date of completion /Today's date as shown on the upload
     
    • shown on the induction paperwork
    • Expiry Date = 3 years from date of completion
    Image Modified
    ONSP Project Specific Business Rule
    • Existing workers that have already been inducted will be allowed to upload a certificate that states that they have completed the Lendlease Part A and Part B induction on site.
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in Onsite
    • No expiry date is required to be recorded for this competency
    • All new workers will be asked to complete the Lendlease Part A Induction online and upload the certificate upon completion
    Link – http://onlinelearning.lendlease.com/building_orientation_part_A
    Expand
    title
    Mates In Construction

    Anchor
    matesinconstruction
    matesinconstruction

    CompetencyCompetency RequirementsUpload RequirementsExamples

    Lendlease ONSP Combined Part A and B Induction

    Anchor
    matesinconstructionmatesinconstruction
    CompetencyCompetency RequirementsUpload RequirementsExamples
    Building & Construction.Course.Mates In Construction - General Awareness Training
    • Name on Attendance List must match the name registered in system
    • Statement of Attendance or Copy of Attendance List
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
  • Expiry Date = 3 years from date of completion
  • Image Removed Expand
    titleMates In Construction
     
    Building & Construction.Course.Mates In Construction - General Awareness Connector Training
    • Name on Attendance List must match the name registered in system
    • Statement of Attendance or Copy of Attendance List
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
     
    Building & Construction.Course.Mates In Construction - Connector Assist Worker Training
    • Name on Attendance List must match the name registered in system
    • Statement of Attendance or Copy of Attendance List
    • The  The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
      Building & Construction.Course.Mates In Construction - Assist Worker Training
    • Name on Attendance List must match the name registered in system
    • Statement of Attendance or Copy of Attendance List
     The
    Expand
    titleOperator
    CompetencyCompetency RequirementsUpload RequirementsExamples
    CompetencyCompetency RequirementsUpload RequirementsExamples
    Anchor
    ausgrid
    ausgrid
    Operator.Induction.AusGrid Electrical Safety Rules *NSW Only*
    • The applicants name shown on this induction Card needs to match the applicants registered name in Onsite
    • AusGrid Electrical Safety Rules *NSW Only* to be listed as complete on induction paperwork
    • Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
     
    Expand
    titleOperator
    ausgridImage AddedOperator.Induction.Energex Network Induction *QLD Only*
    • competency

     

    Anchor
    ausgrid
    Anchor
    endeavour
    endeavour
    Operator.Induction.AusGrid Endeavour Electrical Safety Rules *NSW Only*
    • The applicants name shown on this induction Card paperwork needs to match the applicants registered name in Onsite
    • AusGrid Endeavour Electrical Safety Rules *NSW Only* to  to be listed as complete on induction paperwork
    • Either black and white or colour copies of certification is accepted
    • No expiry date is required to be recorded for this competency
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
    Image Removed 
    Anchor
    endeavourenergexendeavour
    energex
    Operator.Induction.Endeavour Electrical Safety Rules *NSW Energex Network Induction *QLD Only*
    • The applicants name shown on this induction paperwork needs to match the applicants registered name in OnsiteEndeavour Electrical Safety Rules *NSW Only* to be listed as complete on induction paperworkthe applicant’s registered name in Onsite
    • Uploaded Energex Network Induction paperwork needs to display the signatory person’s name & signature as well
    • Either black and white or colour copies of certification is acceptedNo
    • 5 years expiry date is required to be recorded for this competency

    • 5 years expiry date is required to be recorded for this competency
    • The issue date in Onsite should be recorded as the date of completion shown on the induction paperwork
     
    Anchor
    energexenergexImage Added

    ·     

    Expand
    titleSecurity
    Expand
    titleMetropolitan Remand and Reception Centre Specific Rule
    CompetencyCompetency RequirementsUpload RequirementsExamples
    Anchor
    mrrcsecurityawareness
    mrrcsecurityawareness
    Security.Awareness.Declaration.Contractors 
    • The applicants name shown on this
    induction
    • paperwork needs to match the
    applicant’s
    • applicants registered name in
    Onsite
  • Uploaded Energex Network Induction paperwork needs to display the signatory person’s name & signature as well
  • Either black and white or colour copies of certification is accepted
  • 5 years expiry date is required to be recorded for this competency
    • 5 years expiry date is required to be recorded for this competency

     

    Image Removed

    ·     

    Expand
    titleSecurity
    Expand
    titleMetropolitan Remand and Reception Centre Specific Rule
    CompetencyCompetency RequirementsUpload RequirementsExamples AnchormrrcsecurityawarenessmrrcsecurityawarenessSecurity.Awareness.Declaration.Contractors 
    • The applicants name shown on this paperwork needs to match the applicants registered name in Onsite
    • Document needs to be signed and dated by contractor

      Can we please add a hyperlink to the downloadable form where it stipulates available HERE

    • The issue date in Onsite should be recorded as the signed date on the security awareness document
    • No expiry required
    Image Removed 
    • Onsite
    • Document needs to be signed and dated by contractor

      Can we please add a hyperlink to the downloadable form where it stipulates available HERE

    • The issue date in Onsite should be recorded as the signed date on the security awareness document
    • No expiry required
    Image Added

     

    Company.Induction.Ausgrid Safety Rules     Australian Electricity Supply Industry (ESI) issued skills passport is accepted. It must show:
            Applicant Name
        Uploaded document must also include page of passport that shows ‘Safety Rules’ as having been achieved with:
            Ausgrid stamp being shown on this page
            Date of Training
            Trainer / Assessor Name
            Signature
        Ausgrid Certificate of Completion is accepted. It must show:
            Ausgrid Safety Rules
            Contractors Name
            Date of completion Record the Issue date within Onsite:

        Completion date - if listed on certificate (this completion date is always used when displayed)
        Issue date - If only an issue date is listed please enter this as the issue date